Skip to main content
On this page

Session 4 — TUI build (P8) archive

The TUI (adk with no args) was built across 11 sub-phases (α β γ δ ε ζ η θ ι κ λ) during Session 4 on 2026-05-22. The progress doc for the slice itself is docs/plans/progress/P8.md. This archive preserves the build-time artifacts.

tui-specs/

Per-sub-phase binding interface specs. Each was written before the fan-out of 2–3 parallel implementer/test subagents, and pinned every public signature, key binding, file ownership, and exit code so the agents could build in parallel without interface drift.

Spec Slice
SPEC.md α + β — Foundation + read-only queue
SPEC-gamma.md γ — s runs pr-sync, LogPane + SyncPlanPane
SPEC-delta.md δ — r runs a single-PR review worker
SPEC-theta.md θ — WorkersPane + worker async-streaming refactor
SPEC-zeta.md ζ — Multi-select + batch run
SPEC-eta.md η — Add-PR modal + repo management
SPEC-epsilon.md ε — Phase-aware progress
SPEC-kappa.md κ — Agent picker + headless fallback

SPEC-iota.md and SPEC-lambda.md were skipped — those slices were small enough to implement directly without a separate spec.

session-reports/

End-of-session writeups from earlier sessions. Session 4’s own progress lives in docs/plans/progress/P8.md.

File Date
SESSION-1-REPORT.md Session 1
SESSION-2-REPORT.md Session 2
SESSION-3-REPORT.md Session 3 (α+β kickoff)