Session 4 — TUI build (P8) archive
The TUI (adk with no args) was built across 11 sub-phases (α β γ δ ε ζ η θ ι κ λ) during Session 4 on 2026-05-22. The progress doc for the slice itself is docs/plans/progress/P8.md. This archive preserves the build-time artifacts.
tui-specs/
Per-sub-phase binding interface specs. Each was written before the fan-out of 2–3 parallel implementer/test subagents, and pinned every public signature, key binding, file ownership, and exit code so the agents could build in parallel without interface drift.
| Spec | Slice |
|---|---|
SPEC.md |
α + β — Foundation + read-only queue |
SPEC-gamma.md |
γ — s runs pr-sync, LogPane + SyncPlanPane |
SPEC-delta.md |
δ — r runs a single-PR review worker |
SPEC-theta.md |
θ — WorkersPane + worker async-streaming refactor |
SPEC-zeta.md |
ζ — Multi-select + batch run |
SPEC-eta.md |
η — Add-PR modal + repo management |
SPEC-epsilon.md |
ε — Phase-aware progress |
SPEC-kappa.md |
κ — Agent picker + headless fallback |
SPEC-iota.md and SPEC-lambda.md were skipped — those slices were small enough to implement directly without a separate spec.
session-reports/
End-of-session writeups from earlier sessions. Session 4’s own progress lives in docs/plans/progress/P8.md.
| File | Date |
|---|---|
SESSION-1-REPORT.md |
Session 1 |
SESSION-2-REPORT.md |
Session 2 |
SESSION-3-REPORT.md |
Session 3 (α+β kickoff) |